Management platform for renewable energy

Run renewable energy from one place.

Centralize, manage and optimize your renewable energy projects from a single platform — from the first client contact to a commissioned installation and its closed accounting file.

nurun

Active projects

18

Awaiting quote

5

Filings in progress

7

Installed capacity

412 kWc

Pipeline

Sizing
Quote
Filing
Installation
Handover

Recent projects

  • R.014ResidentialBOM
  • C.007CommercialDevis
  • A.003AgricultureDossier
Interface representation. The data shown is fictitious.

Management platform for renewable energy

Nurun

Run renewable energy from one place.

From the first client contact to a commissioned installation: sizing, bill of materials, quotes, administrative filings, purchasing, site work and invoicing. Information entered once, reused everywhere, on a platform that always knows what is missing.

features in production
28features in production
energy domains
3energy domains
steps in the solar chain
13steps in the solar chain

One platform, several energies

Built for renewable energy.

The foundation is shared across domains: clients, projects, documents, purchasing, invoicing. What changes from one domain to the next is the business engine that plugs into it.

Partial

Solar

The business workflow most deeply integrated into the platform.

  • Automatic sizingAvailable
  • Recommendation engineAvailable
  • Bill of materialsAvailable
  • PricingAvailable
+ 6 explore
Available

Carbon

Measure and manage carbon impact, through to a verified report.

  • Scopes 1, 2 and 3Available
  • Activity dataAvailable
  • CBAMAvailable
  • Scenarios & targetsAvailable
+ 2 explore
Roadmap

Hydrogen

The platform's next business domain. The slot exists today; the engine is coming.

  • Electrolysis sizingRoadmap
  • Photovoltaic couplingRoadmap
  • EconomicsRoadmap
Explore

Every step, connected.

An approved study is frozen. Everything downstream derives from it.

  1. Client
  2. Project
  3. Sizing
  4. Frozen study
  5. Bill of materials
  6. Pricing
  7. Quote
  8. STEG / ANME filing
  9. Commercial gate
  10. Purchasing & stock
  11. Installation
  12. Handover
  13. Invoicing

The administrative filing is assembled in parallel with costing, as soon as the study is frozen — not after the quote.

The product exists.

A workspace covering the stages of the solar workflow, with calculation engines covered by golden tests.

nurun

Active projects

18

Awaiting quote

5

Filings in progress

7

Installed capacity

412 kWc

Pipeline

Sizing
Quote
Filing
Installation
Handover

Recent projects

  • R.014ResidentialBOM
  • C.007CommercialDevis
  • A.003AgricultureDossier
Interface representation. The data shown is fictitious.

See Nurun on your own projects.

A thirty-minute walkthrough, run by the team that uses the platform every day.

Our channels

Follow Nurun's progress

See the platform in use

A demonstration with the team, using your own projects: you see what the platform does today.

Request a demonstration Request a demonstration